|  |
Guittard Chocolate
Challenge:
- Keep chocolate factory in operation during re-roofing
- Needed to provide a durable finish for walkablity
- No fumes or odors to interfere with chocolate processing
Solution:
- Installed water based fluid applied "Cool Roof" system to damaged areas
- Coordinated with factory schedules to re-roof in sections
- Vacuumed off existing gravel
- Created smooth surface over previous uneven one
Success:
- Created a walkable, seamless, water-tight roofing surface
- Walkable surface allows for better access to rooftop equipment
- No odor, fumes or dust to hinder factory production
- No disruptions
|
|  |
// Featured Job

 Wilson Sonsini Goodrich & Rosati
// Platinum Edge

Buildings consume 40% of the world's total energy. Platinum Roofing services can help:
| >> | lower utility costs |
| >> | promote environmentally effective use of building materials |
| >> | provide long-term economic returns |
| >> | reduce environmental impact |
Green Capabilities, Solar Installation Consultation, Certifications & Inspections, Roof Maintenance Programs.
|
|